UPS Selectric SPI-120C31-384P1
Specifications
Power, kVA
120
Net weight, kg
1040
Rectifier type
12-pulse
Input isolation transformer
Available
Learn more about UPS Selectric SPI-120C31-384P1
| Input Voltage (V) | 380/400/415 |
|---|---|
| Input Frequency (Hz) | 50/60 ±5% |
| Bypass Input Voltage (V) | 220/230/240 380/400/415 |
| Bypass Input Frequency (Hz) | 50/60 ±10% |
| Output Frequency (Hz) | 50/60 ±0,1% |
| Voltage THD | < 1% (linear load), < 3% (non-linear load) |
| Crest Factor | 3:1 |
| Operating Temperature | 0-40 ° С |
| Relative Humidity | 0-95 % |
| Overload Capacity |
110% - continuous operation; 125% - 10 min; 150% - 1 min; >200% - 1 sec |
| Communication Interface | RS232/Megatec RS485/Modbus 8 dry contact outputs WEB/SNMP Control Board - optional |
| Status, Metering, and Control Indication | HMI touch screen, LED mimic diagram |
| Protection Functions | Over/undervoltage protection, IGBT fault protection, high temperature protection, overload protection, short circuit protection, surge protection |
Power, kVA
120
Net weight, kg
1040
Rectifier type
12-pulse
Input isolation transformer
Available
Input voltage of SPI series UPS, V
380/400/415
Output voltage of SPI series UPS, V
220/230/240
UPS battery voltage, V
384
Operating mode
Parallel
Power factor
0,8
Design version
Cabinet
Width, mm
1100
Depth, mm
800
Height, mm
1800
Documents UPS Selectric SPI-120C31-384P1
A Comprehensive Approach: From Concept to Launch
As experience shows, when purchasing equipment abroad, Russian customers face issues in monitoring fabrication processes, lead times, and logistics.
In order to solve these issues, we have created Selectric — a Russian-Chinese joint venture manufacturing.
01
Design
We participate in developing technical assignments and select optimal solutions from our product range
02
Equipment selection
We analyze the facility requirements and select components that will ensure reliable and efficient system operation
03
Retrofitting and customization
If necessary, we may upgrade and adapt the equipment to the specific project requirements
04
Supervised commissioning
We monitor correct installation, adjustment, and start-up of the equipment